Welcome
Welcome to <strong>modeltrains</strong>.

You are currently viewing our boards as a guest, which gives you limited access to view most discussions and access our other features. By joining our free community, you will have access to post topics, communicate privately with other members (PM), respond to polls, upload content, and access many other special features. Registration is fast, simple, and absolutely free, so please, <a href="/profile.php?mode=register">join our community today</a>!

new layout

Postby Playtime on Sat Apr 26, 2008 4:57 pm

G'day everyone,......

What a cool set up,...
I would have loved to see the multi-level system in operation,....
That would have been awsome!

But it looks like a fun set-up as you have it.
A running night looks like a 'Must do event!'


Playtime.
On rusty tracks with squared wheels,....
What a way to go,.......

Rideing the forum without a Validated Ticket!Image
User avatar
Playtime
 
Posts: 65
Joined: Sat Apr 26, 2008 3:32 pm
Location: Lost in the System without a Validated ticket! Covered in Rust,..Dust and Graffiti,....

Postby sparks on Sat Apr 26, 2008 5:22 pm

there is a bit more planned just to give it a bit more shunting room and another station i could still go the multi level but i dont think i will till its in a perm home.... :D :D
User avatar
sparks
Site Admin
 
Posts: 47
Joined: Tue Jun 26, 2007 9:10 pm
Location: melbounre

Postby sparks on Sun Apr 27, 2008 7:17 pm

More work was done on the layout today. I added another track to the back single line its now got a crossing loop that will go to the new station and goods yard. Benchwork was started for the station as well...
Last edited by sparks on Sun May 25, 2008 3:45 pm, edited 1 time in total.
User avatar
sparks
Site Admin
 
Posts: 47
Joined: Tue Jun 26, 2007 9:10 pm
Location: melbounre

Postby B60 on Sun Apr 27, 2008 11:06 pm

just remember mate make the curves big enough for my c classes when they pass through ( all 4 , super jet ) looks really good bud
User avatar
B60
 
Posts: 18
Joined: Tue Mar 25, 2008 9:31 pm
Location: In the cab of B 60 flat out heading to Melton

Postby wolfpac on Mon Apr 28, 2008 8:17 pm

Perhaps we could look at a round-robin style of Working Bees on MMRC member layouts?

Many hands or something like that... :wink: :D

Wolfpac
User avatar
wolfpac
 
Posts: 193
Joined: Thu Apr 17, 2008 3:33 pm
Location: SSS-Melton line

Postby Eugene on Mon Apr 28, 2008 8:25 pm

I'll bring along a few more C's and we can make it 8 or even 10, now that would be a jet!!
Eugene
 
Posts: 13
Joined: Sun Apr 13, 2008 3:07 pm

Postby wolfpac on Tue Apr 29, 2008 5:25 pm

That's right, talk up the C's! :P :lol:

It would make an amazing lashup though, 8 Cs! :shock: :)

Wolfpac
User avatar
wolfpac
 
Posts: 193
Joined: Thu Apr 17, 2008 3:33 pm
Location: SSS-Melton line

Postby Eugene on Tue Apr 29, 2008 8:37 pm

Why not do the imposible and run 12, since they only ever made 10.
She would be a grand sight, and for good measure we can add a single GY as a load!!!!!!!
Eugene
 
Posts: 13
Joined: Sun Apr 13, 2008 3:07 pm

Postby wolfpac on Tue Apr 29, 2008 8:52 pm

Bah, Modeller's Licence! :P :lol:

That's it, completely overload on motive power, you never can have enough! :)

With either a single GY or a Z van... :shock: :lol:

Wolfpac
User avatar
wolfpac
 
Posts: 193
Joined: Thu Apr 17, 2008 3:33 pm
Location: SSS-Melton line

Postby B60 on Wed Apr 30, 2008 9:40 am

15 c class , one gy ,one grain , more power moooooorrrrrrre powwwwwweerrrrrrrrrr , muhhhhhhhhhhhhhhhhh :twisted:
Keeping the fleet running
User avatar
B60
 
Posts: 18
Joined: Tue Mar 25, 2008 9:31 pm
Location: In the cab of B 60 flat out heading to Melton

Postby sparks on Wed Apr 30, 2008 6:04 pm

and add a few t's and some Y's to the 15 C's
User avatar
sparks
Site Admin
 
Posts: 47
Joined: Tue Jun 26, 2007 9:10 pm
Location: melbounre

Postby tkelly on Wed Apr 30, 2008 10:23 pm

WOW!! 60,000 hpwr shunting. That's got to be a first. :shock: :shock:
User avatar
tkelly
 
Posts: 17
Joined: Tue Apr 29, 2008 8:56 pm

Postby Playtime on Thu May 01, 2008 1:12 am

G'day everyone,.....


I swear I can hear 'Tim the Tool man Taylor' in the house.

More POWER!
:lol:

Playtime.
On rusty tracks with squared wheels,....
What a way to go,.......

Rideing the forum without a Validated Ticket!Image
User avatar
Playtime
 
Posts: 65
Joined: Sat Apr 26, 2008 3:32 pm
Location: Lost in the System without a Validated ticket! Covered in Rust,..Dust and Graffiti,....

Postby wolfpac on Sat May 03, 2008 6:53 pm

Bah, can never have enough horses up the front! :P

Before we completely loose track in this thread, are there any updates on the thread? :lol: :lol:

Wolfpac
User avatar
wolfpac
 
Posts: 193
Joined: Thu Apr 17, 2008 3:33 pm
Location: SSS-Melton line

Postby sparks on Sat May 03, 2008 6:57 pm

not as yet I may do some wiring on it tommrow I was going to lay some track in the station but cant make up my mind as to what station it will be modelled on.... :D
User avatar
sparks
Site Admin
 
Posts: 47
Joined: Tue Jun 26, 2007 9:10 pm
Location: melbounre

PreviousNext

Return to darren\'s layout

Who is online

Users browsing this forum: No registered users and 0 guests

cron